FIELD TOOLS FOR QUARRY & CONSTRUCTION

Know what you need before the first load.

Production, stockpiles, hauling, crushing, water, asphalt, blending and pricing tools built for people who actually have dirt on their boots.

12 calculatorsMobile readyInstant resultsPro membership
FREE

1. Stockpile Tonnage

Estimate pile volume and tons.

Estimated: 888.9 tons
FREE

2. Truck Cycle / Fleet

Cycles, trips per hour and production.

Cycle: 20.0 min · Fleet: 210.0 tph
FREE

3. Excavator Production

Bucket-cycle production estimate.

Estimated: 358.6 tons/hr
FREE

4. Material Volume & Tons

Project material requirements.

Bulk: 46.3 yd³
FREE

5. Cost Per Ton

Operating cost divided by production.

Daily cost: $3400 · Cost: $2.83/ton
FREE

6. Price & Margin

Revenue, margin and gross profit.

Margin: 33.3% · Gross profit: $150,000
PRO

7. Material Blend

Weighted material cost and blend percentages.

🔒
Pro calculator lockedSubscribe to unlock this tool.
PRO

8. Water / Pump

Tank fill time, GPM and daily water volume.

🔒
Pro calculator lockedSubscribe to unlock this tool.
PRO

9. Crusher Production

Effective tph and monthly production.

🔒
Pro calculator lockedSubscribe to unlock this tool.
PRO

10. Haul Road / Asphalt

Road and asphalt tonnage estimates.

🔒
Pro calculator lockedSubscribe to unlock this tool.
PRO

11. Production & Revenue

Monthly and annual revenue projections.

🔒
Pro calculator lockedSubscribe to unlock this tool.
PRO

12. Quote / Delivered Price

Delivered pricing and customer quote builder.

🔒
Pro calculator lockedSubscribe to unlock this tool.
QUARRYCALC PRO

Built for the people running the rock.

Get the advanced quarry calculators, production planning, pricing tools and saved-work features as the Pro platform grows.